Uniform Production Timeline
Estimated Timing: 2 months in advance
-
1. In-Depth Consultation
Two months prior to launch, we will discuss uniform design with you. We will put together a design proposal taking the concept, your computer, and PR strategies into consideration.
-
2. Design Proposal
We will develop the design and make a sample with the actual material. We can also add your company name or logo.
-
3. Sample
After design and materials are approved, we will create a sample. After trying on the sample, we will make any additional adjustments to ensure the product meets your needs.
-
4.Production
Depending on the production, production may take place domestically or internationally.
【Domestic Production】
For small numbers, production is done domestically, offering better quality.
【International Production】
For lower cost and large production volumes. Delivery and request consultation prior to production. -
5. Delivery of Goods
Upon inspection, we will deliver it directly to you. From the consultation to the delivery, it will take approximately 1 to 3 months. However, we will try our best to meet your schedule.